Keldin Engineering successfully delivered the installation, commissioning, and handover of a comprehensive busbar system for a cutting-edge data centre located in Frankfurt, Germany. The project involved the installation of a range of busbars, from primary 4000A bars down to 160A bars servicing the data halls.

After completing the installation, Keldin worked closely with BVPI, the commissioning agent, to ensure the full commissioning of the system. Our team then conducted thermal imaging of the entire busbar system to verify operational efficiency and system reliability.

This project highlights Keldin Engineering’s expertise in critical electrical infrastructure, including power distribution, thermal imaging, and commissioning of high-capacity busbar systems in mission-critical environments.