Keldin were engaged by Mannings construction to deliver the mechanical services for the logistic unit in Horizon Logistic Unit P1.

Keldin EngineeringThis unit has a tenant that is involved with very fast track courier system.

This unit is designed by Barker O’Reilly (BOR) consultant engineers, Keldin worked side by side to deliver the most economical and sustainable logistic building possible.