Clipper
The fit-out programme was very ambitious and required all parties to work quickly and accurately. Keldin Engineering
accomplished all their design process within days of the details being passed to them. They were always available to discuss their
designs and drawings to ensure that the Clipper Engineer could approve promptly and any required amendments were dealt with
speedily. Site work was completed as per plan and the install was finished to a high standard. The Clipper Engineer carried out a
number of site inspection visits and a representative of the Keldin team was always available to meet and discuss progress.
As with most projects, there were additional requirements added to the original scope following operational decisions and Keldin
dealt with each requirement as promptly as the rest of the work and to the same high standard.